 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The
following documents can be downloaded (as noted) or viewed at the project office.
|
|
|
|
|
|
|
|
|
|
|
| |
Environmental
Assessment - Volume III |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
Volume
III - Specialty Reports Prepared for the Project |
| |
Wetland
Delineation Report, September 2004 |
| |
Salmonid
Use And Salmonid Habitat Surveys, September 2004 |
| |
Draft
Phase I Environmental Site Assessment, February 2004 |
| |
Archaeological
Survey Of The Abbott Loop Extension Project, June 2004 |
| |
Moose
Study, December 2004 |
| |
Draft
HLB Site Specific Land Use Plan, June 2004 - part 1 of 2 |
| |
Draft
HLB Site Specific Land Use Plan, June 2004 - part 2 of 2 |
| |
Draft
Dowling Extension Corridor Wetland Ground-Truthing Report, September 2004 |
| |
Draft
Air Quality Analysis, September 2004 |
| |
Draft
Hydrologic And Hydraulic Report, September 2004 |
| |
Noise
Analysis, December 2004 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
|
|
|
|
 |
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
|
 |
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
|
|
 |
|
|
|
|
|
|
|
|
|
|
Questions? Please contact
the
Webdesigner.
August 2003 |
|
|
|
|
|
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |