| The
MOA is proposing an extension of 48th Avenue that will parallel Tudor Road and
provide access to future development in the 3500 Tudor area. This road would
connect the intersection of Boniface Parkway to the intersection of 48th Avenue
and Bragaw Street and would provide improved connectivity to Abbott Loop and
Dowling Road. This important road link was identified in the East Anchorage
Study of Transportation and the MOA Long Range Transportation Plan to provide
much needed east/west connectivity through Anchorage. This project will enhance
transportation system connectivity, improve traffic circulation and reduce congestion
at the Lake Otis Parkway and Tudor Road intersection. Construction is currently
anticipated to occur in 2008. In addition, a 48-inch water transmission main would be routed within the proposed 48th Avenue corridor. The construction of the proposed roadways and the AWWU water main may occur in different phases. |
||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||
|
Questions? Please contact
the Webdesigner. January 2003 |
||||||||||||||||||||||||||||||||||||||||||||